Chungju multipurpose dam which is the largest water project in Korea was constructed in the South Han river that meanders through the central region of the Korean peninsula. Main purposes of this project were the effective utilization of water resources through water supply, electrical energy production, reduction of flood damages in downstream area.

The dam completed in 1986, stands 97.5 meters high and is 464 meters long. The dam, the largest concrete gravity dam in Korea, has concrete volume of 902,000 ton and a reservoir capacity of 2,750 million ton. It also has the largest hydropower plant in Korea with the installed capacity of 400 MW.

At 19.6 km downstream from the maindam, a re-regulation dam was constructed in order to regulate the flow discharged for the reak energy generation from the upstream hydropower plant with the capacity of 12MW is also installed at the re-regulatiom dam.

To complete the project, it took seven and a half years, begun in June 1978 and completed in Dec, 1985. The dam has significantly contributed to reduction the flood damages in the downstream area inclouding the metropolitancity, and it made it possible to develop the frequently inundated area near the Han river like freeways inside the river banks. It also supply 3,380 million ton of water annually for municipal, industrial, irrigation and low flow augmentation in the metropolitan areas of Seoul and its vicinity cities.

In addition, the dam creates a 65 km long water course for the boat trip to Tanyang area, which contributes to the development of sightseeing resources in our country.

 

• Hydropower Plant

- Commercial operation : since may . 5, 1985
- Installed capacity : 412 MW
- Annual average hydropower generation : 844 GWh